2. BGZ commissioned studies/expert reports / 25.2.2021 / Back

Operational programme study of transport volume

This study by DB Netze and Daher Nuclear Technologies concludes that passenger traffic on the Sollingbahn will not be negatively affected by rail transport to and from the Konrad logistics centre (LoK). Most of the transport to the LoK and all transport from the LoK to the Konrad repository will be by rail. A total of four different transport routes are available for this purpose.

Skip to content