• Link to Instagram
  • Link to Xing
  • Link to LinkedIn
  • Link to Youtube
  • Career
  • Media library
  • Deutsch Deutsch German de
  • English English English en
Wir überarbeiten unsere Website – Ihre Meinung hilft uns (4 Minuten Umfrage)   → Zur Umfrage • Wir überarbeiten unsere Website – Ihre Meinung hilft uns (4 Minuten Umfrage)   → Zur Umfrage • Wir überarbeiten unsere Website – Ihre Meinung hilft uns (4 Minuten Umfrage)   → Zur Umfrage
  • About us
    • Our mandate
    • Our guidelines
    • Organisation
    • Management
    • Certificates/ Reports
    • Environmental responsibility
  • Interim storage
    • Interim storage – General information
    • Frequently Asked Questions (FAQ)
    • The waste
  • Sites
  • Projects
    • Extended interim storage
    • Research Programme
    • Return of reprocessed radioactive waste
    • Research reactors
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

ZuMoBau-ZL – Condition assessment and monitoring for the evaluation of the technical service life of building structures of interim storage facilities for high-level radioactive waste

Gegenstand:ZuMoBau­-ZL – Zustandserfassung und Monitoring für die Bewertung der technischen Nutzungsdauer baulicher Anlagen von Zwischenlagern für hochradioaktive Abfälle

Identifizierung geeigneter Monitoring­ und Messtechniken für die Erfassung der maßgeblichen Alterungsprozesse

Entwicklung von Konzepten zur Lebensdauerprognose anhand von Monitoringdaten
Organisation:

BMUKN-Forschungsförderung (Förderkennzeichen RS1586A, 1501609B)

Verbundvorhaben von GRS, BAM und TU Braunschweig (iBMB)

Die BGZ hat einen Sitz im fachlichen Begleitausschuss
Laufzeit:2023 bis 2026
The joint project, coordinated by the iBMB at the Technical University of Braunschweig, aims to develop concepts for service life prediction using appropriate measures and measurement techniques in the field of non-destructive testing. Many of the knowledge and methods that have been proven on conventional structures can be transferred to interim storage facilities. As part of the project, this knowledge is to be compiled in conjunction with the additional requirements that apply to an interim storage facility in order to provide a realistic overview of the ageing processes and effects on an interim storage facility, taking into account practical operating experience. Subsequently, using an exclusion methodology to be developed, the non-relevant ageing processes and effects are excluded from further consideration.

In addition to identifying the relevant degradation processes, the aim is to use models to describe and evaluate such processes, which will make it possible to predict the service life of structural components. The model parameters identified in the process are then analysed with regard to their relevance to the operational safety and protective function of the interim storage facilities. The condition assessment methods for existing structures applicable to engineering structures according to DIN 1076 or to buildings according to VDI 6200 are also analysed for possible adaptation, taking into account the special requirements of interim storage facilities.

After the global and local parameters for describing the relevant degradation mechanisms have been identified, existing sensors and measurement techniques will be analysed to determine their suitability for more accurate and continuous determination of these parameters.

Finally, concepts for the digital storage and data management will be developed for the monitoring and condition data generated for service life prediction. This also involves defining requirements for the integration into suitable building management systems, i.e. interfaces to a BIM (Building Information Modelling) concept or the implementation of the “digital twin” concept.

Publications (german language)

  • ZuMoBau-ZL – 1501668A, VP: Zustandserfassung und Monitoring für die Bewertung der technischen Nutzungsdauer baulicher Anlagen von Zwischenlagern für hochradioaktive Abfälle, TP: adaptives Lebensdauermanagement für Zwischenlagerbauwerke aus Stahlbeton, Halbjahresbericht 2025-1, Institut für Baustoffe, Massivbau und Brandschutz der TU Braunschweig, 2025.
  • ZuMoBau-ZL – 1501668C, VP: Zustandserfassung und Monitoring für die Bewertung der technischen Nutzungsdauer baulicher Anlagen von Zwischenlagern für hochradioaktive Abfälle, TP: Sensorik und Datenmanagement, Halbjahresbericht 2025-1, Institut für Baustoffe, Massivbau und Brandschutz der TU Braunschweig, 2025.
  • ZuMoBau-ZL – UMRS1621B, VP: Zustandserfassung und Monitoring für die Bewertung der technischen Nutzungsdauer baulicher Anlagen von Zwischenlagern für hochradioaktive Abfälle, TP: Nuklearspezifische Aspekte, Halbjahresbericht 2025-1, Institut für Baustoffe, Massivbau und Brandschutz der TU Braunschweig, 2025.
To top All research activities
  • Research activities of the BGZ

  • Research in the field of casks
  • DPOPT
  • MLIFT
  • MSHIFT
  • MSim
  • MSTOR
  • OBSERVE

  • Research in the field of inventories
  • Bend & Break
  • DCS-Monitor II
  • EPRI-ESCP Decay Heat Task Group
  • EPRI-ESCP Dose Modeling Task Group
  • EPRI-ESCP Thermal Modeling Benchmark
  • HYDAX
  • LAGER
  • LEDA
  • MuTomCa
  • SCIP IV / V
  • SpizWurZ
  • SKELETON
  • VisCas

  • Research in the field of interim storage buildings
  • ZuMoBau-ZL

Headquarters

BGZ Gesellschaft für Zwischenlagerung mbH
Frohnhauser Straße 50
45127 Essen, Germany

Phone +49 201 2796-0
Email info@bgz.de

Home | Press | Imprint | Privacy | Compliance

Berlin Office

BGZ Gesellschaft für Zwischenlagerung mbH
Wilhelmstraße 118
10963 Berlin

Phone +49 30 253 592 100
Email info@bgz.de

ecozoom certificate: all website emissions have been compensated.
Scroll to top