• Link to Instagram
  • Link to Xing
  • Link to LinkedIn
  • Link to Youtube
  • Career
  • Media library
  • Deutsch Deutsch German de
  • English English English en
Wir überarbeiten unsere Website – Ihre Meinung hilft uns (4 Minuten Umfrage)   → Zur Umfrage • Wir überarbeiten unsere Website – Ihre Meinung hilft uns (4 Minuten Umfrage)   → Zur Umfrage • Wir überarbeiten unsere Website – Ihre Meinung hilft uns (4 Minuten Umfrage)   → Zur Umfrage
  • About us
    • Our mandate
    • Our guidelines
    • Organisation
    • Management
    • Certificates/ Reports
    • Environmental responsibility
  • Interim storage
    • Interim storage – General information
    • Frequently Asked Questions (FAQ)
    • The waste
  • Sites
  • Projects
    • Extended interim storage
    • Research Programme
    • Return of reprocessed radioactive waste
    • Research reactors
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

ESK statement on the necessity of the Konrad logistics centre and the Würgassen site

Report by the Federal Court of Audit (BRH) on the planned logistics centre for the Konrad repository

Plan approval decision for the Konrad repository

Coalition agreement between SPD, BÜNDNIS 90/DIE GRÜNEN and FDP (2021 to 2025)

State Parliament of Hesse / Minor interpellation by Oliver Ulloth (SPD) dated 2 March 2021 and response by the Minister for the Environment, Climate Protection, Agriculture and Consumer Protection

BGZ statement on the motion of the BÜNDNIS 90/DIE GRÜNEN parliamentary group in the State Parliament of Lower Saxony

State Parliament of Lower Saxony / Committee for the Environment, Energy, Construction and Climate Protection: Minutes of the 72nd session

ESK statement “Safety and logistical requirements for a staging facility for the Konrad repository”

Coalition agreement between CDU, CSU and SPD

Waste Management Transfer Act (EntsorgÜG)

Pages

  • Bend & Break – Investigations into fuel release during fuel rod bending tests
  • Certificates/ Reports
  • Compliance
  • DCS-Monitor II
  • DPOPT – Optimisation of the pressure switch
  • Environmental responsibility
  • EPRI-ESCP Decay Heat Task Group
  • EPRI-ESCP Dose Modeling Task Group
  • EPRI-ESCP Thermal Modeling Benchmark
  • Extended interim storage
  • Extended interim storage | Gorleben
  • Frequently Asked Questions (FAQ)
  • Homepage
  • Homepage-en
  • HYDAX – Hydrogen and Hydrides Distribution in Axial Cladding Direction
  • Interim storage
  • LAGER – Laser Ablation of Gadolinium Evolution Radial
  • LEDA – Long-Term Experimental Dry Storage Analysis
  • Management
  • MLIFT – Leak rate after recompression of aged metal seals
  • MSHIFT – Leak rate of aged metal seals with transverse lid displacement
  • MSim – Numerical simulation of the long-term behaviour of metal seals during long-term interim storage
  • MSTOR – Long-term behaviour of metal seals
  • MuTomCa – Muon Tomography for Shielded Casks
  • OBSERVE – Dose rate and temperature measurement programme
  • Organisation
  • Our guidelines
  • Our mandate
  • Press
  • Privacy Policy
  • Research Program-upto-20-11-2023
  • Research Programme
  • Research programme Fig. 1
  • Research programme Fig. 2
  • Research reactors
  • SCIP IV / V – Studsvik Cladding Integrity Project
  • SKELETON – Determination of the material behaviour of irradiated fuel assembly structural parts
  • SpizWurZ – Stress-induced hydrogen rearrangement in fuel rod cladding (2020 –2024)
  • The logistics centre for the Konrad repository (LoK)
  • The waste
  • Transport and storage casks
  • VisCas – Visualisation of fuel rods in loaded casks
  • ZuMoBau-ZL – Condition assessment and monitoring for the evaluation of the technical service life of building structures of interim storage facilities for high-level radioactive waste

Categories

  • Aktuelles
  • LOK
  • Media library General information material
  • Press release
  • Startseite

Archive

  • December 2023
  • October 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020

Headquarters

BGZ Gesellschaft für Zwischenlagerung mbH
Frohnhauser Straße 50
45127 Essen, Germany

Phone +49 201 2796-0
Email info@bgz.de

Home | Press | Imprint | Privacy | Compliance

Berlin Office

BGZ Gesellschaft für Zwischenlagerung mbH
Wilhelmstraße 118
10963 Berlin

Phone +49 30 253 592 100
Email info@bgz.de

ecozoom certificate: all website emissions have been compensated.
Scroll to top